Two of the windows installed by Dave and Elmer.
The inside of the new chappel-note the size. Makes my truck look rather small.
This is the soffit that Jay, Jake and I were working on. Quarter inch thick Hardiboard.

The inside of the new chappel-note the size. Makes my truck look rather small.
This is the soffit that Jay, Jake and I were working on. Quarter inch thick Hardiboard.

The center section will be Austin stone.

This is a view of the inside where the stage will be.

B enjoying the break between projects--sunshine and about 80 degrees.
The 32 ft trusses are set on the 16 ft side walls. MDS is putting up lower common rafters
MDS put the metal on the porch roof.
COM (Campers On Mission) built the lower structure of the deck and MDS put on the decking and railing.
You may be wondering what do the SOWERs do--Since there are no blueprints for this building, most of the SOWERs do the design, layout and prep work to keep the other volunteers productive. Lots of fun and lots of progress. A little side line on how God provides--As I said earlier. One of the MDS projects was cancelled when the workers were already on the road so rather than turn around and go home they were available to work at Trinity Pines. Also two of the TBM bricklayers projects were recently cancelled so they too were available to come to Trinity Pines.
Glad to hear that MN is finally warming up. We will be glad to see you the first part of April. We are fix'n (oops, guess I have been south too long) to attend the SOWER reunion in Big Sandy TX the last week of March.
Continue to pray for safety on this project. nlsower
The cross by lake Livingston.
These ladies made sweat shirt jackets one afternoon.
One of C's painting projects.
The men continued to work on the worship center and B spent thursday running the dozer to build roads--rained Saturday so he may have to repair some washouts. The ladies were painting, cleaning and crafts. Lots of good fellowship--played putt putt golf Sunday afternoon. Five SOWER couples went to the local Cowboy Church--fun. Of course we went out to eat too. Looks like the weather this week will be great for working. Lows in the 40's and highs in the 60's. Must get to devotions this morning. Thanks for the comments. I was beginning to think my readership was very limited. Even a single word would be encouraging. nlsower
Fish and crosses that are being painted
One of the picture frames that was painted. These items are sold in the gift store.

Rafters etc that we worked on this week. Notice the handy lifts we use.
Stone faced wall one of the SOWERs worked on and he is teaching some other guys how to lay the stone. This facing will be on three sides of the new building--lots of stone to lay. Austin Stone.
This is how the stone arrived. Just dumped in a pile.
The geothermo drilling truck. I am waiting until they get out of the way so I can build the circle driveway with the dozer.
One of the high lift we use to reach the top of the building.
The Dozer I will use to build the driveway and to rebuild another road. It works good--just no brakes and the foot throttle is backwards--push to go slow and release to go fast--I'll try not to run over any cars.
The deck the COM's (Campers on Mission) are building on the end of the Chapel. They are only here one more week, so they have lots to do yet. Hope the weather cooperates--could rain Tuesday. The deck is about 30 ft x 70 ft.