I ran out of time yesterday before I could get these three pictures posted.

BC sitting by the railing he stabilized to the concrete step--used Tap cons.
BC by the door where he replaced the regular hinges with spring loaded hinges. Hope they will be strong enough to close the door.


Part of the Substation kitchen that was sheet rocked--we had to leave the ceiling open for the vent installation people and the wall in the right corner open for the plumbing. The stainless steel unit in the foreground is the range hood. It will be mounted in the far corner. All of the stainless wall covering, vent hood, vent pipes, fire suppression system and vent fans have to be installed by a licensed contractor--about $3500. I would love to see the kitchen when it is completed--we may have to work this project again some other year.