Wednesday, January 28, 2009

some pictures Jan 2009

Why leave such a beautiful wonderland and go to AZ to work?



This is what greeted us in AZ--A neighbor camper came to visit within an hour of setting up camp. He is from IL and is doing some work at the RV park. The next morning a roadrunner stopped by to peek in our back window.


Tuesday, January 27, 2009

Project summaries

We are in Benson AZ until Feb 6th, then we can go to our project in Sahuarita, AZ. It is rather cool today--only in the 50's--last night was in the upper 30's. Cool but much warmer than MN.

Many of you have asked, “what do you do on the projects?” So I thought I would give you a copy of the work summaries that the other SOWERs have written about the Sahuarita Christian Academy in Sahuarita, AZ (this is our February 2009 project).

The first summary is from February 2008 (eight couples). The men built student cubicles; removed and replaced the gutters on the school. They finished the inside of the new storage shed with electricity, shelves and plumbing for a future washing machine; built a wood storage lean-to; cleaned out storage container and moved items to new storage shed. They removed the old fence poles and replaced with new poles and fencing across the back of the school property; painted sheds, cubicles and fencing; set up clothesline poles for the SOWERS; spread gravel; and did other miscellaneous repair jobs in and around the school. Women spent their days working for the school--tutoring students, correcting papers, answering questions, copying lessons, scanning pages, and being an encouragement.

The second summary is from November 2008 (three couples). The men tore down a shed, insulated some water pipes, put a barrier around a water hydrant, and cleaned and serviced all the heating and air conditioning units. They installed a telephone line, put up a fence around the school, put pipes in the ground for a hoops game, and replaced a broken window. They moved all the cement parking curbs, and moved stones for RV sites. They made and painted new lettering for the school’s address. The ladies worked in the school helping teachers--correcting papers, correlating lessons, data entry and prepared a huge mailing.

The third summary is from December 2008 (six couples). The men put up a 42 x 48 canopy over the playground area. They made horses for tables to be used at a Community Outreach Fair, made 4 clothes racks, and made a gate for the driveway. They fenced in the play area to make it more secure, and painted pipes in the play area yellow. They constructed a lean-to to the outside of one of the sheds for an outside work area. The ladies worked in the school helping teachers with grading and playground monitoring.

I hope these summaries will give you a better idea of the wide range of tasks that may be done on a project. In February there will be six couples. We don't know what we will be doing.

I will write about our April project later.

I am using my cell phone for the Internet connection, no pictures this time. nlsower

Thursday, January 22, 2009

86 degrees today

Hi everyone. Didn't make it to NM today--we spent too much time in WalMart in Midland TX. Got some drugs for C. She is doing much better now.

It was 86 degrees today as we crossed western TX on Interstate 20. Couldn't believe the speed limit was 80 mph for cars. Still saw the state patrol have a car stopped. As we came out of the lowlands the temp started dropping--down to 74 by the time we went over the pass. Even got a few drops of rain as we got to the campground.

We are in Mt. View RV park in Van Horn TX. There are over 100 sites all pull thru. I guess land is cheap here so space is no problem. We had lots of choices since there about 10 rigs here. We have wireless and cable tv. All for just $12.50. nlsower

finally on the road

We left Minnesota on Jan 19 and are now in Big Spring, TX for the night. Nice weather in the 70's. C still has her cold so we are taking our time getting going today. Hope to get to NM tonight. nlsower

Friday, December 26, 2008

Sower projects

Hi. Our January 2009 SOWER project was cancelled so we will be heading to AZ after the middle of January. We will work a February project then take March off and then work an April project. Then back home about the first of May. More later--must get to bed. nlsower

Christmas 2008

Family pictures from Christmas 2008.


Kevin...


Rodd...



Paul...



B and C with grandkids.



Finally Back

Hi everyone. Sorry that I have been gone soooo long. The pictures below may help to explain that I have been rather busy.

This is son Paul/Terri's project that has been keeping me too busy to do any blogging.

Notice that the patio doors on each side of the chimney are rather high off the ground--well they were at ground level when we started in the spring. The lower windows were added.


The excess dirt was pushed over the hill to fill some of the back yard.



Since we removed about 4 feet of dirt, we had to build a retaining wall and new patio. Of course nothing could be square--lots of blocks and pavers to cut.

Patio at Christmas--
The addition is 14 by 22 and poured concrete in "lego" blocks (from the footings to the rafters). This is a very neat way to build. The windows are in but the interior work will be in 2009.
Of course we couldn't stop with just the back yard and the addition, so we went on to make a mess out of the front yard too. We had to remove old timbers and then excavate for retaining walls, patio and water falls.No project is complete without neighborhood supervisors. Grandson is the shy one way in the back. He has been my helper all summer. He has been collecting rocks for the water falls and stream.

This is a view of the front yard from the front door. 2009 will involve planting and finishing water falls, stream, patio, steps and walkway. Plus new driveway etc.

It has been a fun summer--working and getting to know the grandkids. Memories!!!!!!!!!!!!