BC and BD are removing the windows like this on three sides of this building. The room will be a new kitchen for the Substation (the restaurant on the base). This is the west wall.

This is the new window on the north wall. It is only temporary for the night--needs the OSB.

This is the new window and OSB on the south wall. The walls will be sided with cement board panels. We were able to complete the siding on the north and south walls by Thursday even if it did rain two days last week. The north wall is under a roof so we could work when it was raining and snowing. We didn't take out the west window yet because once it is out, we will need to move the large kitchen appliances in through the opening. We will need to use the tractor with the loader to move the stove--lots of cast iron.




This is CC's work buddys in the kitchen. They are preparing the noon meal. The base serves about 200 per meal. It depends on how many students are on campus or if they are out on a mission trip.



These pictures are the result of our 6 to 10 inch snow fall last Thursday night. Even if we didn't come to TX to see snow, it was beautiful. Most of it is melted by today (Sunday)