Flower pots that some of the ladies are painting on.
Fish and crosses that are being painted
One of the picture frames that was painted. These items are sold in the gift store.

Rafters etc that we worked on this week. Notice the handy lifts we use.

Stone faced wall one of the SOWERs worked on and he is teaching some other guys how to lay the stone. This facing will be on three sides of the new building--lots of stone to lay. Austin Stone.

This is how the stone arrived. Just dumped in a pile.

The geothermo drilling truck. I am waiting until they get out of the way so I can build the circle driveway with the dozer.

One of the high lift we use to reach the top of the building.

The Dozer I will use to build the driveway and to rebuild another road. It works good--just no brakes and the foot throttle is backwards--push to go slow and release to go fast--I'll try not to run over any cars.

The deck the COM's (Campers on Mission) are building on the end of the Chapel. They are only here one more week, so they have lots to do yet. Hope the weather cooperates--could rain Tuesday. The deck is about 30 ft x 70 ft.
We go to a different church each week--lots of fun to see all of the fellow believers worshipping whereever we go. Lots of friendly people--including "southern" greetings--C says I turn bright red from these greetings. This northern Swede isn't use to so much hugging in church.
Been nice weather this past week-lows in 40's and highs in the 70's with low humidity. Next week the winds are to change--come from the gulf. That means the high humidity will be back.
We went to Huntsville on Friday--drove around the main prision--will go back sometime to see "old sparky". Must get to bed. nlsower