Hi everyone.
Spring is fleeting rapidly--yesterday was 95*--the normal high is 73*. The 95* set a new record.
We are getting settled in our "new" house. Lots of unpacking. We are enjoying city life again. Just 5 minutes from WalMart and Menards--better leave the credit card home.
Must mow grass and weeds this morning. Will need to spray the lawn or I won't have any grass left, just weeds.
Have a great day. nlsower
Tuesday, May 25, 2010
Thursday, April 22, 2010
End of April project
Saturday, April 17, 2010
April 17, 2010
We have had a fun week. We even took time to roast hot dogs.
You can see it was the men's turn to cook.
You can see it was the men's turn to cook.

Of course, no meal is complete without dessert--apple crisp in the dutch oven--very good.

These are the crew. Boyd and Marci

Dennis and Marilyn

Edroy and Judy

Frank and Kathy

Chuck and Sue

Harold, Phyllis and Molly

We are making progress on the deck. 

Judy painting way up high.

More progress on the deck.

Judy did come down for lunch.
We have only 4 more days to finish the deck and railing. The weather forecast is favorable--mostly cloudy so not too hot.
We have only 4 more days to finish the deck and railing. The weather forecast is favorable--mostly cloudy so not too hot. Yesterday and today have been rather quiet--I made chocolate cake in the dutch oven yesterday afternoon. The other SOWERS came over for cake, coffee and conversation--talked a lot since dinner wasn't until 7pm. There were eleven groups coming in so dinner was late. Today there were about 360 for lunch. I even had time to wash the truck and camper yesterday. We are starting to pack up since we will be heading to MN next Friday--should be in NL by Tuesday. Maybe I'll get another posting done before we leave. nlsower
Friday, April 9, 2010
April 9th already!
Hi everyone--It is Friday which means we have completed one week of this project at Trinity Pines, Trinity TX.
Some of the jobs that we have been doing are shown below but we also repaired the vertical siding on the end of a cabin--needed to keep the bats out. Some of the ladies have been doing exterior painting on a house. Also one lady has been sewing on chair cushions. CC has been painting on rocks for the gift store.

Some of the jobs that we have been doing are shown below but we also repaired the vertical siding on the end of a cabin--needed to keep the bats out. Some of the ladies have been doing exterior painting on a house. Also one lady has been sewing on chair cushions. CC has been painting on rocks for the gift store.

Chuck and Dennis (shown below) have been working on the facia on the gazebo plus they worked on the vertical siding.

Tractor with auger--several of the holes filled with water immediately. We didn't need any water for the concrete. It is a trick to drill straight holes on the hillside--also the auger is only 12 inch and the diagonal of the post is almost 9 inches--this required lots of hand work too!!

Three rows of poles set and two to go.

Another angle of view.

All the poles set and some notched ready for beams.

Three rows of beams set--next step on Monday will be to bolt the beams to the post. If the weather continues to cooperate we should make good progress next week

BC, Frank, Harold and Edroy are building a double deck by this pond. The pond will be raised 3 feet so the water depth will be 12 feet. The upper deck is for jumping onto a blob below. Don't know what a blob is? It is a big inflated "blob" where someone sits on and another person jumps onto the blob which in turns propels the first person out into the middle of the pond. The lower deck is 24 by 40 feet and the upper deck is 16 by 20 feet.
The first picture is before we started. That is Lake Livingston out in the distance.

Tractor with auger--several of the holes filled with water immediately. We didn't need any water for the concrete. It is a trick to drill straight holes on the hillside--also the auger is only 12 inch and the diagonal of the post is almost 9 inches--this required lots of hand work too!!

Three rows of poles set and two to go.

Another angle of view.

All the poles set and some notched ready for beams.

Three rows of beams set--next step on Monday will be to bolt the beams to the post. If the weather continues to cooperate we should make good progress next week
.

There has been eleven couples from a church camping club from Houston area here all week. They have been they have been siding a new cabin, painting and gardening. Since that group was here, we got meals all week--sure makes it hard to diet. We are thankful since we are too tired at the end of the day to cook.

This is one of the areas that the camp needs suggestions on how to landscape. There are six more areas that suggestions are needed. Got any ideas let me know (I have more pictures). Right now the camp has unlimited supply of plants from the place that use to supply (I can't remember which) Lowe's or Home Depot.
There has been eleven couples from a church camping club from Houston area here all week. They have been they have been siding a new cabin, painting and gardening. Since that group was here, we got meals all week--sure makes it hard to diet. We are thankful since we are too tired at the end of the day to cook.See you about the end of April. nlsower
Saturday, April 3, 2010
Arrived safely
We are at Trinity Pines Bible Camp and Conference Center. We arrived yesterday afternoon. It was a beautiful drive through the pine forests and wild flowers from San Antonio, TX to Trinity, TX about 275 miles. There are six couples working this project--three are from MN.
I have included some recent pictures from San Antonio and the trip yesterday.--Enjoy.
This is the life of a relaxed SOWER between projects.
I have included some recent pictures from San Antonio and the trip yesterday.--Enjoy.
This is the life of a relaxed SOWER between projects.

Vern pulling wire for the new circuits on a mobile home. 

CC enjoying reading while supper is cooking.

Our new Dutch oven--I laid the thermometer on top so I didn't burn our supper.
Beef and noodles--very simple and delicious. A few days later we made ground beef, corn chips and bean hotdish--also very good.

Beef and noodles--very simple and delicious. A few days later we made ground beef, corn chips and bean hotdish--also very good.
Wednesday, March 31, 2010
Getting ready to move
Hi--we are getting ready to move to Trinity Pines--I have been working on taxes in the evenings and early mornings. During the middle of the day, I have been helping with projects around International Bible Center. Things like cutting up branches, caulking in a shower and leveling a ceiling/floor in an apartment. The jobs help keep my sanity while working on taxes.
I have also been having fun making suppers in the dutch oven--relaxing. CC gets the recipes together and I get the fun of cooking.
We have most of the RV packed up so we can leave early on Friday morning. It will take us about 5 hours to get to Trinity TX.
CC's cousin will be coming through TX next Wed. so we plan to meet them along Interstate 10 at a steak house--should be fun to see them.
I have some more pictures on the camera which I hope to get on the blog soon.
Bye nlsower
I have also been having fun making suppers in the dutch oven--relaxing. CC gets the recipes together and I get the fun of cooking.
We have most of the RV packed up so we can leave early on Friday morning. It will take us about 5 hours to get to Trinity TX.
CC's cousin will be coming through TX next Wed. so we plan to meet them along Interstate 10 at a steak house--should be fun to see them.
I have some more pictures on the camera which I hope to get on the blog soon.
Bye nlsower
Wednesday, March 24, 2010
Only two days left
Hello everyone.
We had a busy weekend so I didn't get a new post written. I guess it was busy, but I can't remember what we did. I was planning on cooking in my new dutch oven but the wind was about 25 mph with gust up to 40. It was also rather cool down to 35* in the morning and only up to 50's during the day. Also have been working on taxes.
BC and Vern have been working on a Staff house--we tiled the bathroom and laid laminate in one bedroom. We had to remove the old tile and level the floor--this is an old old house. The laminate flooring was suppose to just snap together--wrong--it was a real pain. Of course the walls were not straight and the floor was not level. Oh well the pay is still "heavenly".
Vern and I are now working on installing two motion lights on the administration building and installing three outside outlets on a mobile home for three air conditioners. BC is learning how to bend conduit and pull wires.
A week ago we did get to meet the SOWERS for a nearby project. The first couple below are from Iowa. The second couple are from wherever their RV is parked. And the third couple are from Minnesota.

We had a busy weekend so I didn't get a new post written. I guess it was busy, but I can't remember what we did. I was planning on cooking in my new dutch oven but the wind was about 25 mph with gust up to 40. It was also rather cool down to 35* in the morning and only up to 50's during the day. Also have been working on taxes.
BC and Vern have been working on a Staff house--we tiled the bathroom and laid laminate in one bedroom. We had to remove the old tile and level the floor--this is an old old house. The laminate flooring was suppose to just snap together--wrong--it was a real pain. Of course the walls were not straight and the floor was not level. Oh well the pay is still "heavenly".
Vern and I are now working on installing two motion lights on the administration building and installing three outside outlets on a mobile home for three air conditioners. BC is learning how to bend conduit and pull wires.
A week ago we did get to meet the SOWERS for a nearby project. The first couple below are from Iowa. The second couple are from wherever their RV is parked. And the third couple are from Minnesota.

Subscribe to:
Posts (Atom)













